507 52588
info@buhamadco.com
Sat - Thu 7:00 - 15:00, Friday- CLOSED
Home
About us
Vision and Mission
Our Team
Our Certificates
Our Services
General Contract
Maintenance
MEP Works
Interior Design
Packages
Concrete Skeleton Package
Semi-Finished Package
Lux Package On-Key
Super Lux Package On-Key
Ultra Lux Package On-Key
Interior Design Package
Portfolio
Contact Us
Home
About us
Vision and Mission
Our Team
Our Certificates
Our Services
General Contract
Maintenance
MEP Works
Interior Design
Packages
Concrete Skeleton Package
Semi-Finished Package
Lux Package On-Key
Super Lux Package On-Key
Ultra Lux Package On-Key
Interior Design Package
Portfolio
Contact Us
Home
About us
Vision and Mission
Our Team
Our Certificates
Our Services
General Contract
Maintenance
MEP Works
Interior Design
Packages
Concrete Skeleton Package
Semi-Finished Package
Lux Package On-Key
Super Lux Package On-Key
Ultra Lux Package On-Key
Interior Design Package
Portfolio
Contact Us
Explore the Features
MEP Works
Schedule
MEP Works
Service
Implementation of electrical works in full, from extensions with concrete to the finishing stage
Electrical Installations Works
Implementation of all sanitary extensions and installation of sanitary ensembles.
Sanitary Installations Works
After the plan is approved, wooden boxes are installed during the black structure phase.
Central Air Conditioners Works
Installing precursors during the black structure stage, and then supplying devices, machines, and chimneys to the site.
Central Ventilation Works
Supply and installation of external and internal camera equipment.
Supply and Installation of Cameras System
Supply and installation of the satellite system.
Supply and Installation of Satellite System
Supply and installation of rails, fringes, and elevator machinery, in addition to supplying elevator cabins.
Elevator Services